Project Description
The project was to repair existing failed pavement areas, place granular base courses, place asphalt surfaces, place granular shoulder courses, remove and dispose existing pavement, create pavement markings, and perform environmental protection at all sites.
Project Challenges:
Issue 1:
Following the completion of Skyline Road, logging operations caused damage that required additional repairs. The Facilities Manager, Resident Engineer and the contractor jointly determined the extent of additional repair. The effort required several weeks beyond the time that the contractor could have completed this work and moved to other locations, and resulted in a completed product without having to expend any additional funds immediately for repairs.
Issue 2:
The repairs to Cowhide Cove Recreation area included a unique mix design. The area was subject to flooding and wave wash damage, so the design change was experimental. Problems with the design were identified, and the contractor and the design engineer together discussed alternate solutions, made adjustments to the mix design, and modified placement methods resulted in a superior product for the customer.
Benefits of Partnering: